II. Development plans

A. PROVINCIAL IRRIGATION PLAN

IRRIGATION SYSTEMS IN OPERATION AND UNDER CONSTRUCTION

Agencies such as the Ecuadoran Institute for Hydraulic Resources, the Ecuadoran Subcommission-PREDESUR, the former Economic Recovery Board for Loja and Zamora Chinchipe, among others, have recognized the need for extending irrigation to new areas and have taken important steps in this regard.

Under government sponsorship there are presently 11 projects in operation, and 5 under construction. Secondary distribution networks will be provided, beside rare exceptions, to irrigate by gravity through ditches.

As Table A shows, the rivers and mountain streams from which most water is drawn are those of the Catamayo-Chira and Jubones basins. In all of the projects (except for Macara, which still does not have a defined intake), the sluice dams are only to be used to control the level of the water table, not to serve as reservoir dams. Irrigation is their only purpose. In the Chucchuchuir and Paquishapa projects, where there is subterranean surface water and zones of high humidity, drains have been installed to divert excess water. In the rest of the projects, drainage generally consists of natural depressions. For the location and configuration of the works in the projects (principal canals, pumping stations, etc) see Map A-11.

NEW PROJECTS

The process of analysis and selection is comprised of three stages with different degrees of precision: identification, pre-selection, and selection of projects. Based on map data at a scale of 1:50,000, upon which information from this study of slopes and potential soil use was superimposed, 63 irrigation projects were identified, including 8 already selected by INERHI, which has already done a pre-feasibility study for one of them, known as Zapotillo.

For pre-selection of projects the study applied 12 criteria of socio-economic, hydrological, agricultural, environmental, and engineering factors. A matrix was developed and they were assigned points. Among the criteria for selection were availability of water, environmental impact, distance from the source to the zone to be irrigated, and maximum heights for pumping. Through pre-selection, 53 projects were eliminated.

Pre-selected projects were quantified to determine the cost range and other elements needed for economic and environmental assessment, so the projects could be ranked and a program for investment and execution could be prepared.

Table A. PRINCIPAL CHARACTERISTICS OF IRRIGATION IN THE LOJA PROVINCE

PROJECTS IN OPERATION (DIVERSION, ALTITUD m)

SOURCE

BASIN

DIVERTED FLOW m3/s

AREA UNDER IRRIGATION (ha)

No FAMILIES BENEFITTED

IRRIGABLE

IRRIGATED

QUINARA

R. MASANAMACA

CATAMAYO

0,40

183

170

156

1.679

CAMPANA-MALACATUS

Q. CAMPANA

CATAMAYO

0,90

531

100

350

1.747

LA ERA

Q. SAN AGUSTIN

CATAMAYO

0,35

251

133

141

1.640

EL INGENIO

R. CHIRIYACU

CATAMAYO

0,80

291

283

302

1.247

TABLON OÑA

R. ONA

JUBONES

1,00

300

229

320

2.503

VILCABAMBA

R. CAPAMACO

CATAMAYO

0,50

145

135

103

1.633

GUAPALAS

R. MATALANGA

CATAMAYO

0,40

229

142

77

920

PAQUISHAPA

R. RAMAS HUAYCO

JUBONES

1,00

159

98

78

2.560

LA PAPAYA

SAN PABLO DE TENTA

JUBONES

1,00

236

132

222

2.485

CHUCCHUCCHIR

R. SININCAPAC

JUBONES

0,30

70

43

-

2.630

MACARA

R. MACARA

CATAMAYO

2,00

1422

1155

373

515

PROJECTS UNDER CONSTRUCTION

JORUPE-CANGOCHARA

R. LIMONES Y JORUPE

CATAMAYO

0,50

997


200

2.020

SANAMBAY-JIMBURA

R. CHORRERA

CATAMAYO

0,20

180


300

2.340

CHIRIYACU-LUCERO

R. CHIRIYACU

CATAMAYO

2,00

1516


409

1.253

AIRO-FLORIDA

R. AIRO

CATAMAYO

0,30

428


104

1.581

SANTIAGO

R. SANTIAGO

SANTIAGO

1,20

816


435

2.425

After classifying the elements of each irrigation system from the water intake to the primary distribution channels, the following levels of cultivation were defined: a) hot between 100 and 1200 meters, b) temperate from 1,200 to 2,000 meters, and c) cold above 2,000 meters. For the temperate and cold levels rotation of certain crops was assumed. On the basis of a planting pattern for each elevation level, calendars were prepared for irrigation and agricultural water availability. Sprinkling was assumed for most crops, with an overall efficiency of 0.7. After these data were matched with the soil-climate zones defined in the diagnosis, monthly hydraulic requirements were estimated.

Yields and prices for the crops on each elevation level were estimated on the basis of statistics for similar zones elsewhere in the country, adjusted after evaluating Loja's particular characteristics determined from the survey done in connection with the study.

Direct production costs for the farms were determined per parcel, considering the farmer's labor and inputs. To these were added the costs of operating and maintaining the irrigation system, along with depreciation and interest.

Based on production costs, yields, and adjusted agricultural prices the benefit or net agricultural income from each project was estimated. A final estimate contemplates labor needs for three types of parcel envisioned for the three elevation levels-assuming that a family has three active members with 672 person-days per year-and a calculation of total income per parcel.

The foregoing elements served as the basis for an economic evaluation and preliminary ranking of projects from a purely economic viewpoint, as indicated in Table B.

Each project was evaluated in terms of its environmental impact with a matrix that encompassed physical, biotic, and socio-economic factors as well as actions that would impact the environment during the construction, operation, and maintenance of the irrigation system. The impacts were evaluated by their nature (positive or negative), their importance (small, medium, large), and their reversibility (reversible or irreversible).

Table C presents the ranking of the projects selected, which can be implemented if justified by pre-feasibility and/or feasibility studies.

Table B. PRINCIPAL ECONOMIC PARAMETERS OF PRE-SELECTED PROJECTS

CODE

PROJECTS

AREA IRRIGATION ha

COST (1) 103 $/ha

COST PROJECT 106 US$

ANNUAL FIGURES

BENEFIT PROJECT106 US$

INDICE 1 (5) %

BENEF. (2) US$/ha

COST (3) US$/ha

B-C (4) US$/ha

18

MANU 2600

1.400

4,33

6,06

1.750

466

1.284

1,80

28,12

56

YANGANA SURO 2010

220

5,52

1,21

1.750

587

1.163

0,74

19,78

55

LA PALMIRA 1760

520

5,79

3,01

1.812

614

1.198

0,62

19,39

59

BUENAVISTA 1080

450

6,38

2,87

1.829

674

1.155

0,52

16,92

19

RIO LEON 1400

1.040

8,72

9,07

1.812

912

900

0,94

9,57

60

VILCABAMBA ALTO 1800

350

9,96

3,49

1.812

1.038

774

0,37

7,19

42

SANTO DOMINGO 1600

1.280

10,66

13,65

1.812

1.366

446

0,57

3,92

37

MALLA 1280

760

12,54

9,53

1.812

1.300

512

0,39

3,76

36

MATALA 1600

700

9,28

6,50

1.812

1.177

635

0,79

3,72

13

LARAMA 800

2.800

13,38

37,47

1.829

1.428

401

1,12

2,82

34A

CASANGA 1000 (MI-MD)

3.300

10,58

34,92

1.829

1.511

318

1,05

2,80

48B

LAS COCHAS 1200 (MD)

1.560

12,15

18,96

1.829

1.494

335

0,52

2,56

57

USAIME 1000

776

13,94

10,82

1.829

1.442

387

0,30

2,55

23

SABIANGO 800

1.120

14,90

16,68

1.829

1.540

289

0,32

1,79

47B

SANTA ESTHER 1080 (MD)

850

14,97

12,73

1.829

1.822

7

0,01

0,05

62

ZAPOTILLO

6.800

4,03

27,40

1.829

403

1.426

9,70

33,40

TOTAL

21.366


214,35




19,76


NOTES:
1. Investment cost in thousands of dollars per hectare
2. Annual benefit per hectare after deducting production costs
3. Annual cost per hectare of the investment (30 years at 5%), plus costs of operation and maintenance
4. Net annual benefit (B-C) equals annual: benefit Less cost (investment, operation maintenance)
5. Compares the B-C value for the entire area irrigated with the total investment plus interest during construction
6. Exchange rate as of July 1992: $1=1390 Sucres

Table C. RANKING OF THE IRRIGATION PROJECTS

No2

PROJECT

BASIN

PRIORITIES

INDEX3

NET TOTAL BENEFIT

NEG. ENVIR. IMPACT4

RANK

22

ZAPOTILLO

CATAMAYO

1

1

<20%

1

29

MANU

JUBONES

2

2

<20%

2

23

YANGANA SURO

CATAMAYO

3

4

<20%

3

26

LA PALMIRA

CATAMAYO

4

5

<20%

4

31

RIO LEON

JUBONES

6

3

>20%

5

24

BUENAVISTA

CATAMAYO

5

6

<20%

6

37

VILCABAMBA

ALTO CATAMAYO

7

8

<20%

7

28

MALLA

CATAMAYO

8

7

<20%

8

36

USAIME

CATAMAYO

9

10

<20%

9

32

SABIANGO

CATAMAYO

10

9

<20%

10

2 Numbers correspond to Selected Irrigation Projects on Map A-11
3 See last column of Table B
4 <20 = less than 20% negative impacts

Based on analysis of data on the agricultural sector, the current and projected farm labor available, and the irrigation projects in operation, under construction, or proposed by PHILO, these are the conclusions:

· The area now under irrigation in the province is 17,700 ha. INERHI is building projects to serve 4,000 ha, which are to be totally operational in four years Expansion of the areas under irrigation by this agency has been at the rate of 200 ha/year over the past decade. Completion of the projects under construction on deadline will raise this rate to 1000 ha/year.

· It is technically feasible by the year 2020 to add new projects covering 13,436 hectares, at an investment of $90.1 million. This includes the 6,800 ha of the Zapotillo Project. Addition of this irrigated area in 25 years requires average growth of 540 ha/year, with average annual investment of about $3.6 million.

· Annual growth of the agricultural labor force is estimated to be 1,000 persona. This supply can be absorbed after 5 or 10 years by irrigation expansion at the rate of 540 ha/year, together with execution of the projects, programs, and actions of the Plan for Management and Conservation of Renewable Natural Resources of Loja Province. This would check the province's current trend of unemployment. Reduction of unemployment will be further stimulated by the indirect labor demand.

· The gross value of the province's agricultural output in 1990 was $50.3 million. The gross value of annual output of the proposed irrigation projects is $62 million, which brings the grand total to $112.3 million. To move from one figure to the other in 15 years would represent a 5.5% annual growth rate, which is considered attainable.

Based on the foregoing, the goals of the Irrigation Plan are:

· To increase the irrigated area at the rate of 540 hectares per year, starting in the year 2000.

· To invest about $3.6 million per year until the year 2020.

· To create 360 new direct jobs annually through gradual addition of the new irrigation projects.

· To contribute to a 5.5 % increase the gross value of the province's agricultural output.

Table D presents a timeline for programming the projects.

Table D. TIMELINE FOR PROGRAMMING THE PROJECTS

INTERVAL

1992-2000

2000-2005

2005-2010

2010-2015

2015-2020

ha to be added

6.6345

2.700

2.700

2.700

2.700

ha cumulative

6.634

9.334

12.334

14.734

17.434

5 Includes 5 irrigation projects under construction.

B. MANAGEMENT AND CONSERVATION OF RENEWABLE NATURAL RESOURCES

As indicated in the diagnosis, the four major hydrographic systems of Loja Province are undergoing rapid deterioration due to improper slope cultivation practices, clearcutting and burning of forest resources, and overgrazing on the ranches. The problem is compounded by natural phenomena that hasten the process of erosion and sedimentation in the rivers that feed the irrigation systems in operation, under construction, and those proposed by PHILO for this decade and the next two decades, as well as two multiple use binational hydraulic projects: Puyango-Tumbes and Chira-Catamayo.6

6 The Ecuadoran portion of the Chira-Catamayo Project consists of the Macará and El Ingenio projects in operation, and the Jorupe-Cangochara, Sanambay, Chiriyacu-Lucero and Airo-Florida projects under construction.

Map A-4 on Conflicting Soil Use shows 39% of the province's soil resources are over-utilized, particularly in the basins serving the hydraulic projects in operation or contemplated. They need to be protected, in view of their substantial investment, in order to regulate the hydraulic cycles and simultaneously improve the socio-economic situation of the people in the areas. The map also shows that 34% of the area is under-utilized, especially in the far western reaches of the province, where top priority has been assigned to the Zapotillo Project for irrigated agricultural development.

The above-mentioned findings prompt recommendation for the drafting of a project entitled "Plan for Management and Conservation of Renewable Natural Resources," to serve the province as a whole, based on information currently available, with more specific attention to certain pilot areas or pilot basins that have been ranked as high priority.

Based on this study's analysis of the Loja Province irrigation projects in operation, under construction, or proposed, together with the Puyango-Tumbes and Catamayo-Chira binational projects, the largest current and projected investments are in the Pindo-Puyango, Catamayo, and Jubones hydrographic systems, in that order.

In the breakdown at the river basin level, it can be noted that the following basins provide water directly or indirectly to 8 of the 10 projects chosen by PHILO and both binational projects: 1) Puyango-Chaguarpamba, 2) Piscobamba-Arenal, 3) Jubones-Naranjo, and 4) Catamayo-Playas.

The most important project in the Puyango-Chaguarpamba basin is the Puyango-Tumbes project, which takes its water from the Puyango River downstream from its confluence with the Marcabelí River. After passing through the Tahuín Dam in the Arenillas River basin, the water generates 83,000 KW of power and irrigates about 44,020 ha. It is estimated7 that hydro-electric plants at Guayacán (at the end of the bypass tunnel) and Marcabelí (at the foot of the dam) will have a prime generating capacity of 731 and an average capacity of 1,096 GW hours per year. Ecuador has invested $1.050 million in this project alone as of July 1990, of which 65% was for irrigation at a cost of $15,473 per ha and the balance for electric power at a cost of $2,288 per installed kw. Peru's investment was estimated at $1.231 million.

7 All information concerning the Puyango-Tumbes Project is taken from a map prepared for Ecuador by the CIMELCO consortium.

Another irrigation project in the Puyango-Chaguarpamba basin, known as Buenavista, draws its water from the Lambe and Huato streams, which are tributaries of the Puyango. It represents an investment of $2.9 million.

The Piscobamba-Arenal basin drains from the upper Catamayo River, whose lower reaches serve the Zapotillo irrigation project, which has been assigned top priority for execution. It involves an investment of $27.4 million and will irrigate about 6,800 ha. Other irrigation projects in the same basin are planned for Yangana-Suro, Palmira, Upper Vilcabamba, and Malla. Together they represent an investment of $17.2 million to irrigate about 1,850 ha. Four irrigation systems are already in operation in the basin.

Lastly, the Catamayo-Playas basin, located upriver from the Zapotillo Project, should be regarded as a critical area because of the severe erosion and sedimentation that affects an agricultural development zone including the most populous rural cantons in the province.

For the above-mentioned reasons, it is recommended that first priority be given to the detailed preparation of pilot zones for the Puyango-Chaguarpamba and Piscobamba-Arenal basins, and second priority to the Catamayo-Playas basin.

The project will lead to a plan at feasibility level for integral management of the natural resources of Loja Province, including conservation and other actions for sustainable development. The objectives will be:

· To improve the economic and social situation of the residents, increasing the productivity of natural resources and generating local jobs through the use of conservationist farming systems and technology.

· To raise the base flow during dry seasons and improve the water quality in hydraulic projects to meet domestic, industrial, and irrigation needs.

Management of the province's four hydrographic systems includes provision for activities that promote sustainable development through conservation, use, and improvement of the natural, economic, and socio-cultural resources, goods, and services offered by the hydrographic systems. The Drafting of specific proposals will require integral analysis of the behavior and interaction of the principal ecological, socio-economic, and cultural variables.

To ensure balanced treatment of the subject and viability of the proposals, an interdisciplinary team will be organized to evaluate the interest of local communities, particularly in the pilot area or areas. The team will assess their willingness to become involved in the design and execution of the activities or projects.

The study will concentrate on areas that pose the greatest problems for management of renewable natural resources and the greatest potential for sustainable development.

Given the large area of the province, the limited economic resources, the lack of institutional experience in integrated resource management, and the existence of critical areas, management and conservation activities will be concentrated initially in a reduced number of priority sub-basins where human action is destroying the natural heritage. Plans will be made to extend these management and conservation activities to other high priority areas.

The project is expected to produce:

· A consolidated diagnosis for each of the province's four hydrographic systems.

· A General Plan for Survey and Management of the Renewable Natural Resources of Loja Province.

· A study for the purpose of obtaining an investment project for a Management and Conservation Plan for certain critical areas tentatively ranked in this study. It will include drafting of a program for research and strengthening of the national institutions.

For execution, it is recommended that a proposal be drafted to cover the technical, financial, and institutional mechanisms that will ensure satisfactory implementation of the project. This will take 14 months and cost about $900,000.